F-35 fighter jets are expected to be delivered to Vermont in 2019, but as President-elect Donald Trump mentioned in his press conference last week, there have been cost overruns and scheduling delays in the production of the fighter jet.
It was just over three years ago that the Air Force decided Burlington would be home to the F-35 Joint Strike Fighter. This followed years of debate between those who wanted the jets and their economic boost here in Vermont, and those who opposed the planes and the impact their noise could have on local communities.
Phil Ewing, NPR’s national security editor, joined Vermont Edition on Monday to look beyond Vermont and catch us up on the overall status F-35 program.
Over budget and behind schedule
“The aircraft has about doubled in cost per jet since the first estimates when the Pentagon got this program rolling, and it hoped to have operational versions of it in the field years ago,” says Ewing. “The timetable has shifted so much that it just kind of depends on what slice of time you take, but it’s safe to say that it has not gone as well or cost as little as the Defense Department originally intended.”
“But at the same time, the Air Force and the other military services say that taxpayers are going to get what they pay for out of this program – that it will be worth the less-than $400 billion to acquire these aircraft and all the delays because they’ll bring
Article source: http://digital.vpr.net/post/vermont-and-beyond-where-does-f-35-program-stand
